3rd Regional Directorate of State Hydraulic Works (DSİ) – Eskişehir Construction of Günyurdu (Bakraş) Dam
Construction works of the dam which is 45 m in height, 320 m in crest length and have a volume of fill of 2,500,000 m3 and which will irrigate an area of 1250 hectares.