Construction of an irrigation dam, over Asarcık Stream (Asarcık Çayı), which is 290 m in crest length, 74 m in height abovethe foundation and which has an irrigation capacity for 4,200hectares area and a derivation tunnel with a length of 470 m and a volume of fiil of 3,000,000 m3.