Within the scope of the work, in the first part, which will irrigate 146,560 decares of agricultural land, 70,990 meters of GRP Pipe, 313.83 km of HDPE Pipe, 7,000 meters of Steel Pipe will be laid and 1,837 art structures (Water intake, Suction Cup structure, Drainage Structure, Separation Structure, Line Closing Structure) will be installed. A 16 km operation and maintenance road will be constructed.