Turkish Electricity Generation and Transmission Corporation Construction of Ash Dam for Soma B Thermal Power Plant
Construction of the dam for the ash transfer system of theplant, transfer of the used water and ash to the catchment of the dam, use of water taken back from the catchment and for the storage of the ash